Mid West Port Authority Ship Loader
A shipping terminal managed by Mid West Port Authority, Geraldton Port is a shipping terminal utilised for bulk handling of iron ore, mineral concentrates, mineral sands, grain, fuel and general cargo.
The main shipping harbour comprises of seven berths, with four berths including dedicated ship loading facilities.
Lucid was engaged as lead design consultants for the Berth 4 Ship Loader Motor Control Centre (MCC) infrastructure upgrade. The project involved the engineering design of a new MCC to be located on the existing Berth 4 Ship Loader structure. Lucid provided full project management and engineering services for this project including the engagement of all sub-consultants.