NT Archives Data Centre

Following review of the existing single Government Data Centre (GDC) in Darwin, the Northern Territory Government identified risk of future capacity and security issues.

Subsequently, a secondary GDC was commissioned to provide disaster recovery capability. An existing facility was identified as a suitable location to house the secondary GDC and Lucid was engaged as the lead consultant to deliver the design and provide consulting support during construction.

As lead consultant, Lucid engaged and managed an architect, civil engineer, structural engineer, quantity surveyor and certifier while completing electrical, mechanical, fire and hydraulic engineering. The lead consultant role also required liaison with authorities including PowerWater, NTFRS, Development Assessment Services and Government Department stakeholders.