Lucid was engaged by the managing contractor, Built, to lead building services engineering for Stage 1 — the largest healthcare project we’ve delivered to 100% Design Documentation.
We collaborated closely with Built, GHDD, BGE, E-Lab to create resilient, integrated services that would support both immediate clinical needs and future operational demands, whilst addressing existing infrastructure shortfalls. Our approach prioritised staged infrastructure upgrades to ensure seamless operation throughout construction, as well as robust, energy-efficient systems to reduce long-term operating cost.