NCC 2019 Section J
SUMMARY AND TECHNICAL NOTE SERIES
23 MARCH 2020
As of the 1st of May 2020, the new National Construction Code (NCC) 2019 Section J requirements come into regulatory effect with the end of the twelve-month ‘discretionary’ transition period. This revision of Section J introduces a number of enhanced thermal envelope energy efficiency requirements which will influence architectural design. Previously accepted solutions, systems and approaches may no longer be compliant.
To assist our clients in understanding these changes, specifically the impact on architectural design, Lucid has prepared a series of concise and informative technical notes. These distil the changes down to what specifically relates to your designs.
The full series of Lucid NCC Section J 2019 technical notes can be downloaded here:
If you require assistance on a specific project or have a general query related to NCC Section J 2019, please email us at NCC2019SectionJ@lucidconsulting.com.au and a member of our Energy and Sustainability team will be in contact to assist you.